Maintenance and reliability consulting for industrial plants

Fewer breakdowns. More planned work. Outages that finish on time.

KANE works with plant managers and operations leaders in power generation, water, food and beverage, chemical and manufacturing whose maintenance has drifted into reaction: preventive maintenance that doesn't prevent, the same failures coming back, and outages that run past the window.

Fixed-fee assessments find what's driving it, rank what to fix first by risk and cost, and leave your team a 90-day plan it can run. Every engagement is delivered by Adil Najeeb, CMRP, CRL, a former plant maintenance manager with 19 years in industry.

Progress is measured against your own baseline
  • Unplanned downtime
  • Planned vs. emergency work
  • Failures despite PM
  • Schedule compliance
  • Backlog health
  • Outage readiness
19 years on the plant floor
560 MWMaintenance Manager at a combined-cycle power plant
Union crewsand specialty contractors, on turnarounds and daily work
4 industriesEnergy, dairy, chemical and industrial automation

Career includes NRG Energy · Danone · Interplastic Corporation · Wonderware

CMRP · CRL · MBA · Electronics Engineering · Six Sigma Green Belt · Full background →

Why KANE exists

Catch failure at its potential stage, not when it actually fails.

Most equipment failures give a warning before they stop production. P is the first point a developing failure can be detected. F is the point the equipment stops doing its job. The time between them is the window to plan the repair instead of reacting to the breakdown.

Plants living at F pay for it in unplanned downtime, overtime, expedited parts and lost production. KANE's work moves the plant back toward P: knowing which assets matter, detecting problems early, and planning the work before it becomes an emergency.

Maintenance is where production is won or lost, yet it's treated as a cost to cut instead of a capability to build.

Adil Najeeb, CMRP, CRL · Read the mission

The P-F curve Equipment condition over time. Condition holds steady, then begins to decline at point P, where the failure can first be detected, and falls to point F, functional failure. The interval between P and F is the window to plan and fix the problem; after F the plant is reacting. P-F interval · your window to plan Equipment condition Time → P first warning F breakdown Know what matters Detect · plan · fix React
The P-F curve: the earlier a developing failure is found, the more of the repair can be planned.

What you get from every engagement

A ranked list of what to fix first

Each finding tied to the risk or cost it carries, so the first dollars go where they matter.

A 90-day plan with owners

Written for the crew and supervisors you have, not an ideal team you don't.

Working files your team keeps

Registers, scorecards and templates you can update yourselves after I leave.

A check-in 30 days later

A short review of progress against the plan, included in the fee.

Supporting capability

Connecting scattered plant information

The answers to most maintenance questions are spread across the CMMS, the historian, drawings, spreadsheets and people's experience. KANE is developing IOPS, an Intelligent Operations Platform for industrial data and AI analysis, to connect that information and turn it into evidence-backed findings that a person reviews before anything is acted on.

  • Consulting comes first. Every recommendation stands on its own. IOPS is never required to get value from an engagement.
  • A handoff you own. Where it helps, an engagement can close with an IOPS-ready handoff: an asset ID crosswalk, source register, action register and metric dictionary, in formats your team can use with any system.
  • Your data stays yours. No client data goes into IOPS without a written scope, approved access and a security review.

Start with a 30-minute call

Tell me about your plant, the assets that worry you and what you have tried. You will leave the call knowing which assessment fits, or whether you need one at all.